LIFT

INFORMATION

1-2 DAY INSTALLATION

The Ascenda lift is remarkably easy to install, making it an ideal choice for existing homes. Typically, a team of just two professionals can complete the installation within one to two days, providing a quick and efficient solution for homeowners seeking to enhance mobility and convenience.

0 PIT, CAN INSTALL ON THE FLOOR

The Ascenda lift’s pitless design is a standout feature that greatly facilitates its installation in existing homes. Unlike traditional lifts that require extensive groundwork to create a pit, the Ascenda lift can be installed without any significant structural modifications. This not only simplifies the installation process but also reduces costs and minimizes disruption to the household. Homeowners can enjoy the benefits of a modern lift without the hassle and expense of major construction.

RUN IT THROUGH A HOLE IN THE FLOOR…

To install the Ascenda lift, all you need to do is make a hole in your floor. This hole can be as small as one square meter, ensuring minimal disruption. This simple requirement allows the lift to integrate seamlessly into your home without the need for major construction.
Can be done both with both wooden or concrete floors

…OR IN AN EXISTING VOID THANKS TO OUR GATE SYSTEM

The Ascenda lift’s pitless design is a standout feature that greatly facilitates its installation in existing homes. Unlike traditional lifts that require extensive groundwork to create a pit, the Ascenda lift can be installed without any significant structural modifications. This not only simplifies the installation process but also reduces costs and minimizes disruption to the household. Homeowners can enjoy the benefits of a modern lift without the hassle and expense of major construction.

ONLY 89”* OVERHEAD REQUIRED

The Ascenda lift’s requirement of only 89”* in overhead clearance is a significant advantage, greatly facilitating its installation in a wide range of homes. This minimal overhead space makes it suitable for homes with lower ceilings, where traditional lifts might not fit. No need to cut a hole in the ceiling or the roof!

*Subject to local regulations, code and site requirements

0 PIT, CAN INSTALL ON THE FLOOR

The Ascenda lift’s pitless design is a standout feature that greatly facilitates its installation in existing homes. Unlike traditional lifts that require extensive groundwork to create a pit, the Ascenda lift can be installed without any significant structural modifications. This not only simplifies the installation process but also reduces costs and minimizes disruption to the household. Homeowners can enjoy the benefits of a modern lift without the hassle and expense of major construction.

RUN IT THROUGH A HOLE IN THE FLOOR…

To install the Ascenda lift, all you need to do is make a hole in your floor. This hole can be as small as one square meter, ensuring minimal disruption. This simple requirement allows the lift to integrate seamlessly into your home without the need for major construction.
Can be done both with both wooden or concrete floors

…OR IN AN EXISTING VOID THANKS TO OUR GATE SYSTEM

The Ascenda lift’s pitless design is a standout feature that greatly facilitates its installation in existing homes. Unlike traditional lifts that require extensive groundwork to create a pit, the Ascenda lift can be installed without any significant structural modifications. This not only simplifies the installation process but also reduces costs and minimizes disruption to the household. Homeowners can enjoy the benefits of a modern lift without the hassle and expense of major construction.

ONLY 89”* OVERHEAD REQUIRED

The Ascenda lift’s requirement of only 89”* in overhead clearance is a significant advantage, greatly facilitating its installation in a wide range of homes. This minimal overhead space makes it suitable for homes with lower ceilings, where traditional lifts might not fit. No need to cut a hole in the ceiling or the roof!

*Subject to local regulations, code and site requirements

TECHNICAL SPECIFICATIONS

CHOOSE THE PERFECT SIZE FOR YOUR NEEDS

AREA SIZE
STANDING SPACE 27 ¾” x 23 ¾”
CABIN CUT-OUT 32 ¼” x 41 ¾”
HATCH CUT-OUT 36″ x 44 ½”
DOOR OPENING 27 ½”
AREA SIZE
STANDING SPACE 27 ¾” x 31 ½”
CABIN CUT-OUT 32 ¼” x 49 5/8″
HATCH CUT-OUT 36″ x 52 ¼”
DOOR OPENING 27 ½”
AREA SIZE
STANDING SPACE 27 ¾” x 39 ½”
CABIN CUT-OUT 32 ¼” x 57 ½”
HATCH CUT-OUT 36″ x 60 ¼”
DOOR OPENING 27 ½”
AREA SIZE
STANDING SPACE 49 ¼” x 33 ½”
CABIN CUT-OUT 54 7/16″ x 51 3/16″
HATCH CUT-OUT 54″ x 58 ½”
DOOR OPENING 32 ½”
TECHNICAL SPECIFICATIONS

CHOOSE THE PERFECT SIZE FOR YOUR NEEDS

AREA SIZE
STANDING SPACE 27 ¾” x 23 ¾”
CABIN CUT-OUT 32 ¼” x 41 ¾”
HATCH CUT-OUT 36″ x 44 ½”
DOOR OPENING 27 ½”
AREA SIZE
STANDING SPACE 27 ¾” x 31 ½”
CABIN CUT-OUT 32 ¼” x 49 5/8″
HATCH CUT-OUT 36″ x 52 ¼”
DOOR OPENING 27 ½”
AREA SIZE
STANDING SPACE 27 ¾” x 39 ½”
CABIN CUT-OUT 32 ¼” x 57 ½”
HATCH CUT-OUT 36″ x 60 ¼”
DOOR OPENING 27 ½”
AREA SIZE
STANDING SPACE 49 ¼” x 33 ½”
CABIN CUT-OUT 54 7/16″ x 51 3/16″
HATCH CUT-OUT 54″ x 58 ½”
DOOR OPENING 32 ½”
Drive Screw-Drive
Screw Type Trapezoidal
Drive Type EcoSilent 2.0
Motor PMSM UltraQuiet
Motor Power 2.7 kW
Landing Call Stations 2 Wireless Remotes
Lighting Type Automatic EcoSaving LED
Door Type Fully Automatic Saloon
Maximum Load 770 lbs.
Maximum Speed 30 ft/min
Operation Hold to Run
Glass Type Tempered & Laminated
Maintenance 1 x per year
Warranty 1 year
Power Supply 2 x 115 V (Main)
Pit 0”
Overhead 89” *
Maximum Travel 14’
Fixing Points Ground, Slab/Beam, Top
Power Cut Rescue Emergency Battery
Manual Lowering System At bottom of mast

*Subject to local regulations, code and site requirements

Drive Screw-Drive
Screw Type Trapezoidal
Drive Type EcoSilent 2.0
Motor PMSM UltraQuiet
Motor Power 2.7 kW
Landing Call Stations 2 Wireless Remotes
Lighting Type Automatic EcoSaving LED
Door Type Fully Automatic Saloon
Maximum Load 770 lbs.
Maximum Speed 30 ft/min
Operation Hold to Run
Glass Type Tempered & Laminated
Maintenance 1 x per year
Warranty 1 year
Power Supply 2 x 115 V (Main)
Pit 0”
Overhead 89” *
Maximum Travel 14’
Fixing Points Ground, Slab/Beam, Top
Power Cut Rescue Emergency Battery
Manual Lowering System At bottom of mast

*Subject to local regulations, code and site requirements